Hydro Header 300
The Hydro Header is a high-quality prefabricated boiler header that is designed to be utilized with any boiler product, up to 200,000 Btu.
- Reduce header fabrication and installation time by as much as 75%.
- The header can be installed and connected to a conbi-boiler / standard boiler in under 5 minutes.
- The Hydro Header is designed to be installed on either the right or left side of the boiler. The system comes standard with 2 prewired recirculating zones, a port for additional zones, and a 4 zone prewired controller.
What’s Included:
Hydro Header 300
- (2) Bell & Gossett NRF-25 Pumps (mounted to header & pre-wired)
- (1) Bell & Gossett EASB-1 JR NPT Air Separator
- (1) Bell & Gossett FB-38TU 1/2″ Pressure Reducing Valve
- (2) Bell & Gossett 3/4″ Isolation Flange NPT Pair
- (1) Zilmet 1/2″ Back Flow Preventer
- (1) Honeywell 4 Zone Control (pre-wired)
- (1) Power Cable (pre-wired)
- (1) Boiler Control Cable (pre-wired)
